Paver calculator (US)

Count slabs or pavers including joint widths, then size the sub-base, bedding mortar, jointing compound and edge restraints for the whole build-up.

Set up for United States: USD prices, Sales tax, and imperial units with local product sizes.

Works in inches with US paver sizes, and defaults to a 3/8 in joint for slabs or 1/8 in for brick pavers.

US terminology throughout: pavers rather than paving slabs, gravel base rather than MOT Type 1, and prices in dollars with a sales-tax field you set yourself.

Estimate updated. 123 pavers of 16.00 in × 16.00 in pavers required.

Estimate results

How this calculator works

Every figure below is derived rather than looked up, so you can check it against your own numbers. Nothing is hidden behind a black box.

Unit count

Paving is counted by module, not by slab. A 600 × 600 mm slab with a 10 mm joint occupies a 610 × 610 mm module, so it covers 0.3721 m² rather than 0.36 m².

Ignoring the joint over-orders by about 3% on a 10 mm joint and by more on small units — which is why block paving calculations go wrong most often.

units = area ÷ ((unit length + joint) × (unit width + joint))

Pattern and waste

Each pattern carries a recommended minimum waste allowance: 5% for a straight grid, 7% for running bond, 10% for basket weave and 15% for herringbone, where every perimeter unit is a diagonal cut.

If you set a lower allowance than the pattern justifies, the estimate says so rather than quietly under-ordering.

Random-size packs

Mixed-size packs are estimated from the coverage printed on the pack, because the size mix differs between suppliers and no calculator can predict a layout for them. The estimate says this plainly instead of inventing a plan.

Bedding

A full mortar bed is converted to sand and cement at a 1:5 ratio, using 1.6 tonnes of sand and 320 kg of cement per cubic metre of mortar.

A sand screed carries a 1.1 compaction allowance because it consolidates under the plate compactor.

Jointing

Joint volume is derived from geometry: the proportion of the surface that is joint rather than slab, multiplied by the depth of the unit.

For a 600 mm slab with a 10 mm joint that is 3.3% of the area; for a 200 × 100 mm block with a 3 mm joint it is 4.4%. Small units need proportionally more jointing material, not less.

joint volume = area × (1 − unit area ÷ module area) × unit thickness

Common questions

How many paving slabs do I need?
Divide the patio area by the module area of one slab — that is the slab size plus one joint width in each direction — then add a waste allowance for cuts. A 20 m² patio in 600 × 600 mm slabs with 10 mm joints needs 54 slabs before waste, and 60 with a 10% allowance.
How deep should a patio sub-base be?
100 mm of compacted sub-base for a pedestrian patio on firm ground, 150 mm over soft or clay subsoil, and 150–200 mm if vehicles will cross it. Remember to order roughly 30% more loose material than the compacted depth.
How much waste should I allow for paving?
5% for a straight grid on a rectangular area, 10% for most real patios, and 15% or more for herringbone, circular features or any area with angled edges.

US product sizes and conventions

UK version: Patio and paving calculator — metric units and UK product sizes →