Patio bedding layer: how much sand and cement?

Last reviewed 1 July 2026

Short answer

A full mortar bed for slabs is typically 30–50 mm. At 40 mm over 20 m² that is 0.8 m³ of mortar, which needs about 1.28 tonnes of sharp sand and 256 kg of cement at a 1:5 mix — roughly 11 bags of 25 kg. Block paving uses a 30–40 mm sharp sand screed instead, with no cement.

Work it out for your project with the patio and paving calculator

Full mortar bed or sand screed?

Choosing the bedding
Full mortar bedSharp sand screed
Used forSlabs, natural stone, porcelainBlock paving, some permeable systems
Typical depth30–50 mm30–40 mm
MaterialsSharp sand and cement, usually 1:5Sharp sand only
Edge restraintRecommendedEssential
Working timeLimited — mix what you can layUnlimited
Tolerance to movementRigid; cracks if the base movesFlexible; re-levellable

Converting a mortar bed into materials

Start with the volume: area × bedding depth. A 20 m² patio at 40 mm is 0.8 m³ of mortar.

For a 1:5 cement to sharp sand mix, allow 1.6 tonnes of sand and 320 kg of cement per cubic metre of mortar. The sand figure includes an allowance for bulking, since damp sand occupies more volume than its dry weight suggests.

So 0.8 m³ needs 1.28 tonnes of sand — two UK bulk bags — and 256 kg of cement, which is 11 bags of 25 kg.

sand (t) = mortar volume × 1.6 cement (kg) = mortar volume × 320

Bedding quantities for common patios

Full mortar bed at 40 mm, 1:5 mix
Patio areaMortar volumeSharp sandCement (25 kg bags)
10 m²0.40 m³0.64 t6
20 m²0.80 m³1.28 t11
30 m²1.20 m³1.92 t16
50 m²2.00 m³3.20 t26

Getting the bed right

  • Lay on a full bed, not on dabs. Five spots of mortar under each corner and the middle leaves voids that fill with water, freeze and crack the slab. It is the most common cause of a rocking, cracked patio.
  • Keep the mix fairly dry. A wet, sloppy bed will not support the slab as you tap it down. It should hold its shape when squeezed.
  • Mix only what you can lay. Mortar that has started to go off will not bond, and re-tempering it with more water ruins the strength.
  • Prime the underside of porous natural stone with a slurry primer. Without it the bond fails and you get picture-framing where moisture migrates through.
  • Screed sand beds to a consistent depth and do not compact them before laying — the units are vibrated in afterwards.