How much concrete do I need?

Last reviewed 1 July 2026

Short answer

Volume is length × width × thickness, with the thickness converted to the same unit as the other two. A 3 m × 2.4 m slab at 100 mm is 0.72 m³. That is about 61 bags of 25 kg ready-to-use concrete, or a 0.8 m³ ready-mix order once waste is allowed — and it weighs about 1.7 tonnes.

Work it out for your project with the concrete slab calculator

Getting the units right

The single most common mistake is mixing units: entering the thickness in millimetres while the length and width are in metres. A 100 mm slab is 0.1 m, so a 3 × 2.4 m slab is 3 × 2.4 × 0.1 = 0.72 m³, not 720 m³.

In imperial, convert inches to feet by dividing by 12. A 10 ft × 8 ft slab at 4 in is 10 × 8 × 0.3333 = 26.7 ft³, which is 0.99 cubic yards.

volume = length × width × thickness (all in the same unit)

Volumes for common jobs

Concrete volume for typical domestic slabs
JobSizeThicknessVolume (m³)Volume (yd³)
Shed base2.4 × 1.8 m (8 × 6 ft)100 mm (4 in)0.430.57
Small patio slab3 × 2.4 m (10 × 8 ft)100 mm (4 in)0.720.94
Garage floor6 × 3 m (20 × 10 ft)150 mm (6 in)2.703.53
Single driveway10 × 3 m (33 × 10 ft)125 mm (5 in)3.754.90
Fence post hole300 mm dia × 600 mm0.042 each0.055 each

Footings and post holes

A strip footing is length × width × depth, the same as a slab, just deeper and narrower. A 12 m run of footing 600 mm wide and 200 mm deep is 1.44 m³.

A round post hole is π × radius² × depth. A 300 mm diameter hole 600 mm deep is π × 0.15² × 0.6 = 0.042 m³, or about 42 litres. Nine posts is 0.38 m³ — roughly 32 bags of 25 kg, which is more than most people expect from 'a few post holes'.

It is normal not to deduct the post itself. The small over-order covers spillage and the hole never being quite the shape you dug it.

Weight

Normal-weight concrete is about 2,400 kg/m³ wet. That 0.72 m³ patio slab is 1,730 kg — more than a tonne and a half of material to mix and move by hand.

Weight is the number that decides how the job is done. Under about 0.25 m³ is a comfortable afternoon with a mixer. Above 1 m³, mixing on site becomes a serious undertaking and ready-mix is almost always the right answer.

How much extra to order

  • 5–10% for a slab on a prepared base. Covers spillage and an uneven sub-base.
  • 10–15% for footings. Trench sides are never as neat as the drawing, and over-dig is real.
  • Ready-mix minimum. Most plants have a minimum load and charge a short-load fee below about 3–4 m³. Ask before you assume a 0.8 m³ order is possible.
  • Never round down. Being 5% short on a pour is far more expensive than being 10% over.

Related questions

How much does a cubic metre of concrete weigh?
About 2,400 kg, or 2.4 tonnes, for normal-weight concrete. A cubic yard is about 4,050 lb, roughly 2 US tons.
Is it cheaper to mix concrete myself?
For very small volumes, yes, because there is no delivery minimum. Ready-mix usually becomes cheaper per cubic metre well before 1 m³, and it saves hours of labour. The crossover depends on your local delivery charges.